Birmingham Hippodrome Architect: Associated Architects Contractor: HBG Concrete contractor: May Contractors Structural engineer: Buro Happold Everdure Caltite System waterproof concrete used in the lift pit. » back to previous page «
Cementaid (UK) Limited 1 Baird Close, Crawley, West Sussex, RH10 9SY Tel: 01293 447878 Fax: 01293 447880
Copyright © 2005 Cementaid (UK) LTD - All rights reserved.