Clarendon Dock, Belfast Architect: Robinson Patterson Contractor: Tracey Bros. Structural engineer: Armstrong & Shaw Everdure Caltite system concrete was used in the basement slab and walls for the new Tesco regional HQ office next to the dock. » back to previous page «
Cementaid (UK) Limited 1 Baird Close, Crawley, West Sussex, RH10 9SY Tel: 01293 447878 Fax: 01293 447880
Copyright © 2005 Cementaid (UK) LTD - All rights reserved.