| |
National Maritime College, Cork
Architect: Building Design Partnership
Contractor: Bovis Lendlease
Concrete contractor: Pierse Contracting
Structural engineer: Building Design Partnership
Everdure Caltite System waterproof concrete used to construct the 6 metre deep diving pool and in the marine workshop
slab and walls, weather simulation pool and lift pit.
» back to previous page «
|
|
|