Westminster Theatre Contractor: Gilmac Concrete contractor: Joseph Gallagher Structural engineer: Walsh Associates Caltite System concrete used to waterproof the basement slab and retaining walls of the re-development of the theatre after it was burnt down in 2002. » back to previous page «
Cementaid (UK) Limited 1 Baird Close, Crawley, West Sussex, RH10 9SY Tel: 01293 447878 Fax: 01293 447880
Copyright © 2005 Cementaid (UK) LTD - All rights reserved.